Quick contact info

Introducing a truly professional WordPress theme built to last! We developed Wilmër for all construction & architecture sites.

icon_widget_image Monday-Friday: 9am to 5pm; Satuday: 10ap to 2pm icon_widget_image 7300-7398 Colonial Rd, Brooklyn, NY 11209, USA icon_widget_image + (123) 1234-567-8900 + (123) 1234-567-8901 icon_widget_image wilmer@qodeinteractive.com wilmer2@qodeinteractive.com
Image Alt

Hay PID – Modernisation Initiative

PROJECTS

Hay PID – Modernisation Initiative

Crighton’s project managed the entire modernisation project for the Hay Private Irrigation District. This included converting all open channels to a fully piped, pressurised system for 112 water delivery outlets, upgrading the existing Hay PID pump station to a fully automated pumping system which can be controlled from remote devices and updating all water meter components in the system from dethridge wheels to pattern approved water meters.

This $10,000,000 project was completed on time and within budget with over 70% of the budgeted funds utilised by local contractors throughout the construction phase. This project also gave greater access and control to it’s members through it’s online water ordering capacity.

By doing this modernisation it minimised the risk of danger to the public associated with open channels and insect and water born diseases. The water savings generated from this project were returned to the environment. 

Crighton's manage Hay Private Irrigation district which has been very successful. They do the day-to-day operations, all the accounting, identify and carry out maintenance, so for us it's a one stop shop. We haven't found anything yet that they haven't been able to manage, engineer or orchestrate. When we have a problem, we are dealing with the person who constructed it, that’s worth more than money.

Project Info

Date: